Please use the Plan a Trip or Next Ride features on calgarytransit.com for the most accurate schedules.
We review our bus routes and schedules four times a year to figure out what’s working and what could be improved. We consider several factors including feedback from our customers and drivers, ridership levels, and changing traffic patterns. Learn more
To check the status of a specific route, enter a route number below and press enter on your keyboard or "done" or "go" on your mobile device.
Please note the elevator at Anderson Station is temporarily unavailable. We are working to get it fixed.
Please note we have an elevator outage at Westbrook Station, north head toward 69 Street Station. Please use the elevator at the south station head while we are working to get this one fixed.
Starting Monday, August 8 at 9 a.m.and continuing until further notice, there will be lane closures on 1 Street S.W. between 6 Avenue S.W. and 8 Avenue S.W.
Eastbound Route 1 will be detoured as follows:
Stop #3392, located at southbound 1 Street S.W. @ 7th Avenue S.W. will be temporarily closed:
A temporary stop will be available at southbound Centre Street S. @ 7 Avenue S.W. (nearside)
Beginning Monday, January 16 at start of service until further notice, lane closures will be occurring for utility work on 5 Avenue between 3 Street and 1 Street S.W.
Stop #5084, located on eastbound 5 Avenue S.W. @ 2 Street S.W. will be closed.
Please use one of the following in lieu of the closed stop:
Beginning Monday, January 16 at start of service until further notice, lane closures will be occurring for utility work on 5 Avenue between 3 Street and 1 Street S.W.
Stop #5084, located on eastbound 5 Avenue S.W. @ 2 Street S.W. will be closed.
Please use one of the following in lieu of the closed stop:
Starting Thursday, December 15 at 4 p.m. and continuing until Friday, June 30 at the end of service, southbound 8 Street S.W. sidewalk will be closed south of 11 Avenue S.W. for construction.
Stop #5124, on southbound 8 Street S.W. @ 11 Avenue S.W., will be closed.
A temporary stop will be available on southbound 8 Street S.W. @ 12 Avenue S.W., nearside approx. 48 m south of the existing stop.
Beginning Monday, January 16 at start of service until further notice, lane closures will be occurring for utility work on 5 Avenue between 3 Street and 1 Street S.W.
The following stops will be temporarily closed:
Please use one of the following in lieu of the closed stops:
From August 26 until further notice, stop #8765, located northbound 17A Street S.W. @ 26 Avenue S.W. will be closed. Please use the temporary stop on eastbound 26 Avenue @ 18 Street S.W.
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Route 6 will travel:
Stop #5303 located on northbound 1 Street @ 7 Avenue S.W. will be temporarily closed.
Please use stop #5115 located on westbound 6 Avenue @ 1 Street S.W.
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Route 7 will travel:
The following stops are temporarily closed:
Please use the following stops:
Starting Monday, August 8 at 9 a.m. and continuing until further notice, there will be lane closures on 1 Street S.W. between 6 Avenue S.W. and 8 Avenue S.W.
Route 10 will be detoured as follows:
The following stops will be temporarily closed:
Customers are directed use the detour stop:
Starting Thursday, December 15 at 4 p.m. and continuing until Friday, June 30 at the end of service, southbound 8 Street S.W. sidewalk will be closed south of 11 Avenue S.W. for construction.
Stop #5124, on southbound 8 Street S.W. @ 11 Avenue S.W., will be closed.
A temporary stop will be available on southbound 8 Street S.W. @ 12 Avenue S.W., nearside approx. 48 m south of the existing stop.
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Route 13 will travel:
The following stops are temporarily closed:
Please use the following stops:
Beginning Monday, January 16 at start of service until further notice, lane closures will be occurring for utility work on 5 Avenue between 3 Street and 1 Street S.W.
Stop #9957, located on eastbound 5 Avenue S.W. @ 2 Street S.W. will be closed.
Please use one of the following in lieu of the closed stop:
Beginning Monday, January 16 at start of service until further notice, lane closures will be occurring for utility work on 5 Avenue between 3 Street and 1 Street S.W.
The following stops will be temporarily closed:
Please use one of the following in lieu of the closed stops:
Starting Monday, August 8 at 9 a.m. and continuing until further notice, there will be lane closures on 1 Street S.W. between 6 Avenue S.W. and 8 Avenue S.W.
Routes 22 & 66 will be detoured as follows:
Stop #5299, located at northbound 1 Street S.W. @ 8 Avenue S.W. will be temporarily closed:
A temporary stop will be available at northbound Centre Street S @ 7 Avenue S.E. (farside)
Beginning at start of service on Wednesday, March 15 and continuing until end of service on Friday, June 30, Olympic Way S.E. will have closures and lane reversals due to Green Line construction. Route 24 will be detoured as follows.
Westbound (to Downtown):
Eastbound (To Quarry Park):
The following stops will be temporarily closed:
Please use the following temporary stops in lieu of the closed stops:
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Route 24 will travel:
The following stops will be temporarily closed:
Please use temporary stop located on northbound Centre Street @ 7 Avenue S.E. (farside)
Beginning Various – 3 hours ahead of the event and continuing until Various - 1 hour post event (see the event schedule for detailed dates), the lane reversal set up on 12 Avenue S.E. between Olympic Way S.E. and 3 Street S.E. will be taken down 3 hours prior to special events at the Saddledome.
The event schedule:
Route 24 Westbound (To Downtown) is detoured as follows:
Route 24 Westbound Eastbound (To Quarry Park) is detoured as follows:
The following stops will be temporarily closed:
Customers are directed to use the following stops:
Starting Monday, August 8 at 9 a.m.and continuing until further notice, there will be lane closures on 1 Street S.W. between 6 Avenue S.W. and 8 Avenue S.W.
Routes 22 & 66 will be detoured as follows:
Stop #5299, located at northbound 1 Street S.W. @ 8 Avenue S.W. will be temporarily closed:
A temporary stop will be available at northbound Centre Street S @ 7 Avenue S.E. (farside)
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Route 70 will travel:
The following stops will be temporarily closed:
Please use temporary stop located on northbound Centre Street @ 7 Avenue S.E. (farside)
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Eastbound Route 90 will travel:
Westbound Route 90 will travel:
The following stops will be temporarily closed::
Please use the following temporary stop locations:
Starting Tuesday, March 14 until further notice, eastbound 64 Avenue ramp onto southbound Castleridge Boulevard N.E. will be temporarily closed for road construction.
Buses travelling toward Mcknight/Westwinds bus loop:
No stop missed.
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Route 101 will travel:
The following stops will be temporarily closed::
Please use the following temporary stops:
Starting Monday, March 8 through Thursday, June 1, 2023, stop #6566 located on southbound Dalton Drive @ Dalhousie Drive N.W. will be temoprarily closed to accomodate construction.
A temporary stop will be placed on Dalton Drive N.W. just south of the pedestrian walkway.
Due to an accident in the area, Route 138 is detoured in Royal Oak until further notice. Buses are travelling:
From Rocky Ridge Terminal:
To Rocky Ridge Terminal:
The following stops are temporarily closed:
Beginning Monday, January 16 at start of service until further notice, lane closures will be occurring for utility work on 5 Avenue between 3 Street and 1 Street S.W.
Stop #4564, located on eastbound 5 Avenue S.W. @ 2 Street S.W. will be closed.
Please use one of the following in lieu of the closed stop:
Starting at 9 a.m. on Monday, January 16 and continuing until 3 p.m. on Monday, April 17, there will be a left hand lane closure on 7 Street S.W. @ 7 Avenue S.W. to accommodate utility work.
Stop #2030, located on southbound 7 Street S.W. @ 7 Avenue S.W. will be closed.
A temporary stop will be provided approximately 30 metres north of the closed stop at southbound 7 Street @ 7 Avenue S.W. (farside).
Beginning Monday, January 16 at start of service until further notice, lane closures will be occurring for utility work on 5 Avenue between 3 Street and 1 Street S.W.
Stop #4564, located on eastbound 5 Avenue S.W. @ 2 Street S.W. will be closed.
Please use one of the following in lieu of the closed stop:
Due to lane closures on southbound 1 Street S.W., Route 305 will be on detour until further notice. Buses will travel: East on 5 Avenue S.W. South on Centre Street S.W. West on 6 Ave S.W., to reular route
Starting Monday, August 8 at 9 a.m. and continuing until further notice, there will be lane closures on 1 Street S.W. between 6 Avenue S.W. and 8 Avenue S.W.
Max Purple will be detoured as follows:
The following stops will be temporarily closed:
Please use one of the following temporary stops in lieu of the closed stops:
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Route 449 will travel:
The following stops are temporarily closed:
Please use the following stops:
Please note we have an elevator outage at Westbrook Station, north head toward 69 Street Station. Please use the elevator at the south station head while we are working to get this one fixed.
Please note the elevator at Anderson Station is temporarily unavailable. We are working to get it fixed.
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Route 449 will travel:
The following stops are temporarily closed:
Please use the following stops:
Starting Monday, August 8 at 9 a.m. and continuing until further notice, there will be lane closures on 1 Street S.W. between 6 Avenue S.W. and 8 Avenue S.W.
Max Purple will be detoured as follows:
The following stops will be temporarily closed:
Please use one of the following temporary stops in lieu of the closed stops:
Due to lane closures on southbound 1 Street S.W., Route 305 will be on detour until further notice. Buses will travel: East on 5 Avenue S.W. South on Centre Street S.W. West on 6 Ave S.W., to reular route
Beginning Monday, January 16 at start of service until further notice, lane closures will be occurring for utility work on 5 Avenue between 3 Street and 1 Street S.W.
Stop #4564, located on eastbound 5 Avenue S.W. @ 2 Street S.W. will be closed.
Please use one of the following in lieu of the closed stop:
Starting at 9 a.m. on Monday, January 16 and continuing until 3 p.m. on Monday, April 17, there will be a left hand lane closure on 7 Street S.W. @ 7 Avenue S.W. to accommodate utility work.
Stop #2030, located on southbound 7 Street S.W. @ 7 Avenue S.W. will be closed.
A temporary stop will be provided approximately 30 metres north of the closed stop at southbound 7 Street @ 7 Avenue S.W. (farside).
Beginning Monday, January 16 at start of service until further notice, lane closures will be occurring for utility work on 5 Avenue between 3 Street and 1 Street S.W.
Stop #4564, located on eastbound 5 Avenue S.W. @ 2 Street S.W. will be closed.
Please use one of the following in lieu of the closed stop:
Due to an accident in the area, Route 138 is detoured in Royal Oak until further notice. Buses are travelling:
From Rocky Ridge Terminal:
To Rocky Ridge Terminal:
The following stops are temporarily closed:
Starting Monday, March 8 through Thursday, June 1, 2023, stop #6566 located on southbound Dalton Drive @ Dalhousie Drive N.W. will be temoprarily closed to accomodate construction.
A temporary stop will be placed on Dalton Drive N.W. just south of the pedestrian walkway.
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Route 101 will travel:
The following stops will be temporarily closed::
Please use the following temporary stops:
Starting Tuesday, March 14 until further notice, eastbound 64 Avenue ramp onto southbound Castleridge Boulevard N.E. will be temporarily closed for road construction.
Buses travelling toward Mcknight/Westwinds bus loop:
No stop missed.
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Eastbound Route 90 will travel:
Westbound Route 90 will travel:
The following stops will be temporarily closed::
Please use the following temporary stop locations:
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Route 70 will travel:
The following stops will be temporarily closed:
Please use temporary stop located on northbound Centre Street @ 7 Avenue S.E. (farside)
Starting Monday, August 8 at 9 a.m.and continuing until further notice, there will be lane closures on 1 Street S.W. between 6 Avenue S.W. and 8 Avenue S.W.
Routes 22 & 66 will be detoured as follows:
Stop #5299, located at northbound 1 Street S.W. @ 8 Avenue S.W. will be temporarily closed:
A temporary stop will be available at northbound Centre Street S @ 7 Avenue S.E. (farside)
Beginning Various – 3 hours ahead of the event and continuing until Various - 1 hour post event (see the event schedule for detailed dates), the lane reversal set up on 12 Avenue S.E. between Olympic Way S.E. and 3 Street S.E. will be taken down 3 hours prior to special events at the Saddledome.
The event schedule:
Route 24 Westbound (To Downtown) is detoured as follows:
Route 24 Westbound Eastbound (To Quarry Park) is detoured as follows:
The following stops will be temporarily closed:
Customers are directed to use the following stops:
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Route 24 will travel:
The following stops will be temporarily closed:
Please use temporary stop located on northbound Centre Street @ 7 Avenue S.E. (farside)
Beginning at start of service on Wednesday, March 15 and continuing until end of service on Friday, June 30, Olympic Way S.E. will have closures and lane reversals due to Green Line construction. Route 24 will be detoured as follows.
Westbound (to Downtown):
Eastbound (To Quarry Park):
The following stops will be temporarily closed:
Please use the following temporary stops in lieu of the closed stops:
Starting Monday, August 8 at 9 a.m. and continuing until further notice, there will be lane closures on 1 Street S.W. between 6 Avenue S.W. and 8 Avenue S.W.
Routes 22 & 66 will be detoured as follows:
Stop #5299, located at northbound 1 Street S.W. @ 8 Avenue S.W. will be temporarily closed:
A temporary stop will be available at northbound Centre Street S @ 7 Avenue S.E. (farside)
Beginning Monday, January 16 at start of service until further notice, lane closures will be occurring for utility work on 5 Avenue between 3 Street and 1 Street S.W.
The following stops will be temporarily closed:
Please use one of the following in lieu of the closed stops:
Beginning Monday, January 16 at start of service until further notice, lane closures will be occurring for utility work on 5 Avenue between 3 Street and 1 Street S.W.
Stop #9957, located on eastbound 5 Avenue S.W. @ 2 Street S.W. will be closed.
Please use one of the following in lieu of the closed stop:
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Route 13 will travel:
The following stops are temporarily closed:
Please use the following stops:
Starting Thursday, December 15 at 4 p.m. and continuing until Friday, June 30 at the end of service, southbound 8 Street S.W. sidewalk will be closed south of 11 Avenue S.W. for construction.
Stop #5124, on southbound 8 Street S.W. @ 11 Avenue S.W., will be closed.
A temporary stop will be available on southbound 8 Street S.W. @ 12 Avenue S.W., nearside approx. 48 m south of the existing stop.
Starting Monday, August 8 at 9 a.m. and continuing until further notice, there will be lane closures on 1 Street S.W. between 6 Avenue S.W. and 8 Avenue S.W.
Route 10 will be detoured as follows:
The following stops will be temporarily closed:
Customers are directed use the detour stop:
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Route 7 will travel:
The following stops are temporarily closed:
Please use the following stops:
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Route 6 will travel:
Stop #5303 located on northbound 1 Street @ 7 Avenue S.W. will be temporarily closed.
Please use stop #5115 located on westbound 6 Avenue @ 1 Street S.W.
From August 26 until further notice, stop #8765, located northbound 17A Street S.W. @ 26 Avenue S.W. will be closed. Please use the temporary stop on eastbound 26 Avenue @ 18 Street S.W.
Beginning Monday, January 16 at start of service until further notice, lane closures will be occurring for utility work on 5 Avenue between 3 Street and 1 Street S.W.
The following stops will be temporarily closed:
Please use one of the following in lieu of the closed stops:
Starting Thursday, December 15 at 4 p.m. and continuing until Friday, June 30 at the end of service, southbound 8 Street S.W. sidewalk will be closed south of 11 Avenue S.W. for construction.
Stop #5124, on southbound 8 Street S.W. @ 11 Avenue S.W., will be closed.
A temporary stop will be available on southbound 8 Street S.W. @ 12 Avenue S.W., nearside approx. 48 m south of the existing stop.
Beginning Monday, January 16 at start of service until further notice, lane closures will be occurring for utility work on 5 Avenue between 3 Street and 1 Street S.W.
Stop #5084, located on eastbound 5 Avenue S.W. @ 2 Street S.W. will be closed.
Please use one of the following in lieu of the closed stop:
Beginning Monday, January 16 at start of service until further notice, lane closures will be occurring for utility work on 5 Avenue between 3 Street and 1 Street S.W.
Stop #5084, located on eastbound 5 Avenue S.W. @ 2 Street S.W. will be closed.
Please use one of the following in lieu of the closed stop:
Starting Monday, August 8 at 9 a.m.and continuing until further notice, there will be lane closures on 1 Street S.W. between 6 Avenue S.W. and 8 Avenue S.W.
Eastbound Route 1 will be detoured as follows:
Stop #3392, located at southbound 1 Street S.W. @ 7th Avenue S.W. will be temporarily closed:
A temporary stop will be available at southbound Centre Street S. @ 7 Avenue S.W. (nearside)
Please note the elevator at Anderson Station is temporarily unavailable. We are working to get it fixed.
Please note we have an elevator outage at Westbrook Station, north head toward 69 Street Station. Please use the elevator at the south station head while we are working to get this one fixed.
Starting Monday, August 8 at 9 a.m.and continuing until further notice, there will be lane closures on 1 Street S.W. between 6 Avenue S.W. and 8 Avenue S.W.
Eastbound Route 1 will be detoured as follows:
Stop #3392, located at southbound 1 Street S.W. @ 7th Avenue S.W. will be temporarily closed:
A temporary stop will be available at southbound Centre Street S. @ 7 Avenue S.W. (nearside)
Beginning Monday, January 16 at start of service until further notice, lane closures will be occurring for utility work on 5 Avenue between 3 Street and 1 Street S.W.
Stop #5084, located on eastbound 5 Avenue S.W. @ 2 Street S.W. will be closed.
Please use one of the following in lieu of the closed stop:
Beginning Monday, January 16 at start of service until further notice, lane closures will be occurring for utility work on 5 Avenue between 3 Street and 1 Street S.W.
Stop #5084, located on eastbound 5 Avenue S.W. @ 2 Street S.W. will be closed.
Please use one of the following in lieu of the closed stop:
Starting Thursday, December 15 at 4 p.m. and continuing until Friday, June 30 at the end of service, southbound 8 Street S.W. sidewalk will be closed south of 11 Avenue S.W. for construction.
Stop #5124, on southbound 8 Street S.W. @ 11 Avenue S.W., will be closed.
A temporary stop will be available on southbound 8 Street S.W. @ 12 Avenue S.W., nearside approx. 48 m south of the existing stop.
Beginning Monday, January 16 at start of service until further notice, lane closures will be occurring for utility work on 5 Avenue between 3 Street and 1 Street S.W.
The following stops will be temporarily closed:
Please use one of the following in lieu of the closed stops:
From August 26 until further notice, stop #8765, located northbound 17A Street S.W. @ 26 Avenue S.W. will be closed. Please use the temporary stop on eastbound 26 Avenue @ 18 Street S.W.
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Route 6 will travel:
Stop #5303 located on northbound 1 Street @ 7 Avenue S.W. will be temporarily closed.
Please use stop #5115 located on westbound 6 Avenue @ 1 Street S.W.
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Route 7 will travel:
The following stops are temporarily closed:
Please use the following stops:
Starting Monday, August 8 at 9 a.m. and continuing until further notice, there will be lane closures on 1 Street S.W. between 6 Avenue S.W. and 8 Avenue S.W.
Route 10 will be detoured as follows:
The following stops will be temporarily closed:
Customers are directed use the detour stop:
Starting Thursday, December 15 at 4 p.m. and continuing until Friday, June 30 at the end of service, southbound 8 Street S.W. sidewalk will be closed south of 11 Avenue S.W. for construction.
Stop #5124, on southbound 8 Street S.W. @ 11 Avenue S.W., will be closed.
A temporary stop will be available on southbound 8 Street S.W. @ 12 Avenue S.W., nearside approx. 48 m south of the existing stop.
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Route 13 will travel:
The following stops are temporarily closed:
Please use the following stops:
Beginning Monday, January 16 at start of service until further notice, lane closures will be occurring for utility work on 5 Avenue between 3 Street and 1 Street S.W.
Stop #9957, located on eastbound 5 Avenue S.W. @ 2 Street S.W. will be closed.
Please use one of the following in lieu of the closed stop:
Beginning Monday, January 16 at start of service until further notice, lane closures will be occurring for utility work on 5 Avenue between 3 Street and 1 Street S.W.
The following stops will be temporarily closed:
Please use one of the following in lieu of the closed stops:
Starting Monday, August 8 at 9 a.m. and continuing until further notice, there will be lane closures on 1 Street S.W. between 6 Avenue S.W. and 8 Avenue S.W.
Routes 22 & 66 will be detoured as follows:
Stop #5299, located at northbound 1 Street S.W. @ 8 Avenue S.W. will be temporarily closed:
A temporary stop will be available at northbound Centre Street S @ 7 Avenue S.E. (farside)
Beginning at start of service on Wednesday, March 15 and continuing until end of service on Friday, June 30, Olympic Way S.E. will have closures and lane reversals due to Green Line construction. Route 24 will be detoured as follows.
Westbound (to Downtown):
Eastbound (To Quarry Park):
The following stops will be temporarily closed:
Please use the following temporary stops in lieu of the closed stops:
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Route 24 will travel:
The following stops will be temporarily closed:
Please use temporary stop located on northbound Centre Street @ 7 Avenue S.E. (farside)
Beginning Various – 3 hours ahead of the event and continuing until Various - 1 hour post event (see the event schedule for detailed dates), the lane reversal set up on 12 Avenue S.E. between Olympic Way S.E. and 3 Street S.E. will be taken down 3 hours prior to special events at the Saddledome.
The event schedule:
Route 24 Westbound (To Downtown) is detoured as follows:
Route 24 Westbound Eastbound (To Quarry Park) is detoured as follows:
The following stops will be temporarily closed:
Customers are directed to use the following stops:
Starting Monday, August 8 at 9 a.m.and continuing until further notice, there will be lane closures on 1 Street S.W. between 6 Avenue S.W. and 8 Avenue S.W.
Routes 22 & 66 will be detoured as follows:
Stop #5299, located at northbound 1 Street S.W. @ 8 Avenue S.W. will be temporarily closed:
A temporary stop will be available at northbound Centre Street S @ 7 Avenue S.E. (farside)
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Route 70 will travel:
The following stops will be temporarily closed:
Please use temporary stop located on northbound Centre Street @ 7 Avenue S.E. (farside)
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Eastbound Route 90 will travel:
Westbound Route 90 will travel:
The following stops will be temporarily closed::
Please use the following temporary stop locations:
Starting Tuesday, March 14 until further notice, eastbound 64 Avenue ramp onto southbound Castleridge Boulevard N.E. will be temporarily closed for road construction.
Buses travelling toward Mcknight/Westwinds bus loop:
No stop missed.
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Route 101 will travel:
The following stops will be temporarily closed::
Please use the following temporary stops:
Starting Monday, March 8 through Thursday, June 1, 2023, stop #6566 located on southbound Dalton Drive @ Dalhousie Drive N.W. will be temoprarily closed to accomodate construction.
A temporary stop will be placed on Dalton Drive N.W. just south of the pedestrian walkway.
Due to an accident in the area, Route 138 is detoured in Royal Oak until further notice. Buses are travelling:
From Rocky Ridge Terminal:
To Rocky Ridge Terminal:
The following stops are temporarily closed:
Beginning Monday, January 16 at start of service until further notice, lane closures will be occurring for utility work on 5 Avenue between 3 Street and 1 Street S.W.
Stop #4564, located on eastbound 5 Avenue S.W. @ 2 Street S.W. will be closed.
Please use one of the following in lieu of the closed stop:
Starting at 9 a.m. on Monday, January 16 and continuing until 3 p.m. on Monday, April 17, there will be a left hand lane closure on 7 Street S.W. @ 7 Avenue S.W. to accommodate utility work.
Stop #2030, located on southbound 7 Street S.W. @ 7 Avenue S.W. will be closed.
A temporary stop will be provided approximately 30 metres north of the closed stop at southbound 7 Street @ 7 Avenue S.W. (farside).
Beginning Monday, January 16 at start of service until further notice, lane closures will be occurring for utility work on 5 Avenue between 3 Street and 1 Street S.W.
Stop #4564, located on eastbound 5 Avenue S.W. @ 2 Street S.W. will be closed.
Please use one of the following in lieu of the closed stop:
Due to lane closures on southbound 1 Street S.W., Route 305 will be on detour until further notice. Buses will travel: East on 5 Avenue S.W. South on Centre Street S.W. West on 6 Ave S.W., to reular route
Starting Monday, August 8 at 9 a.m. and continuing until further notice, there will be lane closures on 1 Street S.W. between 6 Avenue S.W. and 8 Avenue S.W.
Max Purple will be detoured as follows:
The following stops will be temporarily closed:
Please use one of the following temporary stops in lieu of the closed stops:
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Route 449 will travel:
The following stops are temporarily closed:
Please use the following stops:
Please note we have an elevator outage at Westbrook Station, north head toward 69 Street Station. Please use the elevator at the south station head while we are working to get this one fixed.
Please note the elevator at Anderson Station is temporarily unavailable. We are working to get it fixed.
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Route 449 will travel:
The following stops are temporarily closed:
Please use the following stops:
Starting Monday, August 8 at 9 a.m. and continuing until further notice, there will be lane closures on 1 Street S.W. between 6 Avenue S.W. and 8 Avenue S.W.
Max Purple will be detoured as follows:
The following stops will be temporarily closed:
Please use one of the following temporary stops in lieu of the closed stops:
Due to lane closures on southbound 1 Street S.W., Route 305 will be on detour until further notice. Buses will travel: East on 5 Avenue S.W. South on Centre Street S.W. West on 6 Ave S.W., to reular route
Beginning Monday, January 16 at start of service until further notice, lane closures will be occurring for utility work on 5 Avenue between 3 Street and 1 Street S.W.
Stop #4564, located on eastbound 5 Avenue S.W. @ 2 Street S.W. will be closed.
Please use one of the following in lieu of the closed stop:
Starting at 9 a.m. on Monday, January 16 and continuing until 3 p.m. on Monday, April 17, there will be a left hand lane closure on 7 Street S.W. @ 7 Avenue S.W. to accommodate utility work.
Stop #2030, located on southbound 7 Street S.W. @ 7 Avenue S.W. will be closed.
A temporary stop will be provided approximately 30 metres north of the closed stop at southbound 7 Street @ 7 Avenue S.W. (farside).
Beginning Monday, January 16 at start of service until further notice, lane closures will be occurring for utility work on 5 Avenue between 3 Street and 1 Street S.W.
Stop #4564, located on eastbound 5 Avenue S.W. @ 2 Street S.W. will be closed.
Please use one of the following in lieu of the closed stop:
Due to an accident in the area, Route 138 is detoured in Royal Oak until further notice. Buses are travelling:
From Rocky Ridge Terminal:
To Rocky Ridge Terminal:
The following stops are temporarily closed:
Starting Monday, March 8 through Thursday, June 1, 2023, stop #6566 located on southbound Dalton Drive @ Dalhousie Drive N.W. will be temoprarily closed to accomodate construction.
A temporary stop will be placed on Dalton Drive N.W. just south of the pedestrian walkway.
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Route 101 will travel:
The following stops will be temporarily closed::
Please use the following temporary stops:
Starting Tuesday, March 14 until further notice, eastbound 64 Avenue ramp onto southbound Castleridge Boulevard N.E. will be temporarily closed for road construction.
Buses travelling toward Mcknight/Westwinds bus loop:
No stop missed.
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Eastbound Route 90 will travel:
Westbound Route 90 will travel:
The following stops will be temporarily closed::
Please use the following temporary stop locations:
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Route 70 will travel:
The following stops will be temporarily closed:
Please use temporary stop located on northbound Centre Street @ 7 Avenue S.E. (farside)
Starting Monday, August 8 at 9 a.m.and continuing until further notice, there will be lane closures on 1 Street S.W. between 6 Avenue S.W. and 8 Avenue S.W.
Routes 22 & 66 will be detoured as follows:
Stop #5299, located at northbound 1 Street S.W. @ 8 Avenue S.W. will be temporarily closed:
A temporary stop will be available at northbound Centre Street S @ 7 Avenue S.E. (farside)
Beginning Various – 3 hours ahead of the event and continuing until Various - 1 hour post event (see the event schedule for detailed dates), the lane reversal set up on 12 Avenue S.E. between Olympic Way S.E. and 3 Street S.E. will be taken down 3 hours prior to special events at the Saddledome.
The event schedule:
Route 24 Westbound (To Downtown) is detoured as follows:
Route 24 Westbound Eastbound (To Quarry Park) is detoured as follows:
The following stops will be temporarily closed:
Customers are directed to use the following stops:
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Route 24 will travel:
The following stops will be temporarily closed:
Please use temporary stop located on northbound Centre Street @ 7 Avenue S.E. (farside)
Beginning at start of service on Wednesday, March 15 and continuing until end of service on Friday, June 30, Olympic Way S.E. will have closures and lane reversals due to Green Line construction. Route 24 will be detoured as follows.
Westbound (to Downtown):
Eastbound (To Quarry Park):
The following stops will be temporarily closed:
Please use the following temporary stops in lieu of the closed stops:
Starting Monday, August 8 at 9 a.m. and continuing until further notice, there will be lane closures on 1 Street S.W. between 6 Avenue S.W. and 8 Avenue S.W.
Routes 22 & 66 will be detoured as follows:
Stop #5299, located at northbound 1 Street S.W. @ 8 Avenue S.W. will be temporarily closed:
A temporary stop will be available at northbound Centre Street S @ 7 Avenue S.E. (farside)
Beginning Monday, January 16 at start of service until further notice, lane closures will be occurring for utility work on 5 Avenue between 3 Street and 1 Street S.W.
The following stops will be temporarily closed:
Please use one of the following in lieu of the closed stops:
Beginning Monday, January 16 at start of service until further notice, lane closures will be occurring for utility work on 5 Avenue between 3 Street and 1 Street S.W.
Stop #9957, located on eastbound 5 Avenue S.W. @ 2 Street S.W. will be closed.
Please use one of the following in lieu of the closed stop:
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Route 13 will travel:
The following stops are temporarily closed:
Please use the following stops:
Starting Thursday, December 15 at 4 p.m. and continuing until Friday, June 30 at the end of service, southbound 8 Street S.W. sidewalk will be closed south of 11 Avenue S.W. for construction.
Stop #5124, on southbound 8 Street S.W. @ 11 Avenue S.W., will be closed.
A temporary stop will be available on southbound 8 Street S.W. @ 12 Avenue S.W., nearside approx. 48 m south of the existing stop.
Starting Monday, August 8 at 9 a.m. and continuing until further notice, there will be lane closures on 1 Street S.W. between 6 Avenue S.W. and 8 Avenue S.W.
Route 10 will be detoured as follows:
The following stops will be temporarily closed:
Customers are directed use the detour stop:
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Route 7 will travel:
The following stops are temporarily closed:
Please use the following stops:
Starting Tuesday, October 18 and continuing until further notice, 1 Street will be closed between 6 - 8 Avenue S.W. for utility work.
Route 6 will travel:
Stop #5303 located on northbound 1 Street @ 7 Avenue S.W. will be temporarily closed.
Please use stop #5115 located on westbound 6 Avenue @ 1 Street S.W.
From August 26 until further notice, stop #8765, located northbound 17A Street S.W. @ 26 Avenue S.W. will be closed. Please use the temporary stop on eastbound 26 Avenue @ 18 Street S.W.
Beginning Monday, January 16 at start of service until further notice, lane closures will be occurring for utility work on 5 Avenue between 3 Street and 1 Street S.W.
The following stops will be temporarily closed:
Please use one of the following in lieu of the closed stops:
Starting Thursday, December 15 at 4 p.m. and continuing until Friday, June 30 at the end of service, southbound 8 Street S.W. sidewalk will be closed south of 11 Avenue S.W. for construction.
Stop #5124, on southbound 8 Street S.W. @ 11 Avenue S.W., will be closed.
A temporary stop will be available on southbound 8 Street S.W. @ 12 Avenue S.W., nearside approx. 48 m south of the existing stop.
Beginning Monday, January 16 at start of service until further notice, lane closures will be occurring for utility work on 5 Avenue between 3 Street and 1 Street S.W.
Stop #5084, located on eastbound 5 Avenue S.W. @ 2 Street S.W. will be closed.
Please use one of the following in lieu of the closed stop:
Beginning Monday, January 16 at start of service until further notice, lane closures will be occurring for utility work on 5 Avenue between 3 Street and 1 Street S.W.
Stop #5084, located on eastbound 5 Avenue S.W. @ 2 Street S.W. will be closed.
Please use one of the following in lieu of the closed stop:
Starting Monday, August 8 at 9 a.m.and continuing until further notice, there will be lane closures on 1 Street S.W. between 6 Avenue S.W. and 8 Avenue S.W.
Eastbound Route 1 will be detoured as follows:
Stop #3392, located at southbound 1 Street S.W. @ 7th Avenue S.W. will be temporarily closed:
A temporary stop will be available at southbound Centre Street S. @ 7 Avenue S.W. (nearside)